Für ein bestmögliches Erlebnis
bitte das Handy drehen.

16.10.2024

The aim of the renovation is to preserve the historical substance of the roof while ensuring structural integrity. Great importance is attached to reusing the original building materials. Therefore, whenever possible, the old bricks were carefully secured during dismantling and will now be reinstalled. This ensures that the historical appearance is not affected and the roof remains as a cultural heritage site.

Project manager: Bernhard Pfister, Andrin Sennhauser

Site manager: Andrin Sennhauser, Mario Bieli

October 2024


SHARE